Contractor Command CenterOperations Workspace
Autosaved
GarrettOwner
G

Good morning, Garrett.

Your business is moving. Here’s what matters right now.
AI BUSINESS INTELLIGENCE

Today at a glance

$31,840
Projected gross profit this month
↑ 8.4% vs last month
3Jobs today
$$84.2KOpen bids
2Conflicts detected
✦ AI Insight
You’re on track to exceed your monthly profit goal by 12%. View details ›
92
Business Health
Excellent
JOBS TODAY
3

 12 crew scheduled

 18.4 labor hrs planned

OPEN BIDS
$84,250
Across 6 proposals
Average margin38.6%
MATERIAL READINESS
86%
Ready
2 items need attention
View Materials
▣   UPCOMING SCHEDULE
Today3 jobs
Next 7 days11 jobs
3
T
3
W
2
T
1
F
0
S
1
S
1
M
RECENT JOB ACTIVITY
Reynolds Residence
Installation in progress
Today, 8:30 AM ›
Johnson Backyard
Proposal sent
Yesterday, 4:15 PM ›
Smith Putting Green
Job completed
Aug 18 ›
PROFIT TREND
$31,840
Projected Profit
8.4% ↑
vs last month
Goal: $28,500

Fast Estimate

Built for the contractor standing on-site. Start the bid in seconds; open advanced controls only when needed.

What are we building?
Residential Lawn
Pet Turf
Putting Green
Commercial
Playground
Other
Site Access
Easy
Moderate
Difficult
1 Site2 Installation3 Materials4 Crew / Sub5 Equipment6 Margin AI7 Proposal

Smith Residence

2,850 SF · Residential Lawn · Franklin, TN

Bid Builder

PremiumValueCustom
ItemQtyInternal CostSell
Turf
Harvest Hills 96
Price confirmed 2 days ago ✓
Price confirmed 2 days ago ✓
3,135 SF$4,765$7,210
Base
4" recommended · WHY?
35.2 CY$1,820$3,050
OptiFill86 bags$1,375$1,633
Labor
AI crew: 1 lead + 3 installers · WHY?
3 days$4,220$7,240
Equipment / Haul-Off / Misc.$1,280$2,120
87%
ESTIMATE CONFIDENCE
3 assumptions remain unconfirmed · Review why
✦ WHAT DID I FORGET?

Possible missed exposure: $620–$980

Difficult rear access may increase handling. Delivery and dump allowance appear low.

✦ MARGIN AI
41.2%Healthy
Revenue$21,253
Project Cost$12,493
Gross Profit$8,760

AI Site Analysis

Review site conditions before the bid is finalized.

Detected Site Conditions

Rear Access
Approx. 38" gate · limited machine access
Labor Risk
Excavation
Existing lawn · moderate removal expected
Moderate
Drainage
Low area near patio edge
Review
Irrigation
4 visible heads · verify before excavation
Document
AI FINANCIAL IMPACT
$1,150
Recommended added bid exposure
Additional labor+$780
Handling / access+$220
Drainage allowance+$150

Installation Standard

Recommended baseline with contractor override on every major variable.
Installation ItemRecommendedContractor SelectionStatus
Excavation4"Standard
Compacted Base4"Override
Finished SlopeSite-specificReview
Infill RateProduct/ApplicationMatched
✦ INSTALLATION AI

Changing base depth from 4" to 3" reduces estimated aggregate, excavation, haul-off and labor. Projected bid cost decreases by $930.

This selection differs from the recommended baseline. Confirm site drainage and subgrade stability before finalizing.

Crew Optimizer

Choose internal crew, subcontractor or hybrid — then compare cost, skill coverage and duration.
AI RECOMMENDED
INTERNAL CREW
$2,640

4 people · 2.2 days

1 Lead · 2 Installers · 1 Laborer

Skill coverage100%
Projected margin41.2%
SUBCONTRACTOR
$5,300

ABC Turf Installers

$1.86/SF · estimated 3 days

Internal availability impactNone
Projected margin36.7%
Need a custom combination?
Use internal crew for demo/base and subcontract specialty finish work.

Equipment

Owned equipment stays simple; rentals only add cost when needed.
EquipmentStatusDaily CostUse on Job
Mini SkidOwned$0 Simple Mode
Plate CompactorOwned$0 Simple Mode
Mini ExcavatorRental$350/day
Sod CutterRental$185/day
✦ EQUIPMENT AI

Current access conditions favor the owned mini skid. No rental equipment is required for the present scope.

Final Bid Audit

A last check before anything goes to the customer.

What Did I Forget?

Delivery
Included
Dump / Haul-Off
Allowance appears low
Review
Access Labor
AI adjustment not yet applied
+$780
Warranty / Terms
Included
UNACCOUNTED EXPOSURE
$1,020–$1,460

Your current margin is healthy, but this exposure could reduce actual margin to approximately 35–37%.

Quick AI Estimate

Built for the contractor standing in the backyard. Give us the basics and let AI do the grunt work.
🎙

Describe the job

“2,850 square feet, narrow gate, existing grass, two dogs, use Refuge 73 with premium infill, probably 4 inches excavation.”

AI DRAFT PREVIEW

What I heard

7 fields captured
Project Type
Pet Turf
Known
Gate Access
Narrow / likely hand-carry exposure
Detected
Recommended Base
4" starting baseline
Recommended
Dump Fee
$650 provisional allowance
Estimated

AI Estimate Ready

The estimate is built. Confirm the uncertain pieces before it goes to the customer.
87%
HIGH CONFIDENCE
Most inputs are confirmed. Three assumptions still need review.
Measurements
2,850 SF entered on site
Known
Access
Narrow gate flagged from photo/description
Detected
Target Margin
40% company default
Default
Dump Fee
$650 allowance
Confirm
RECOMMENDED SELL PRICE
$24,035
40.0% target margin
Estimated Cost$14,421
Gross Profit$9,614

Scope Lock

Once accepted, the original scope is frozen. Anything new becomes a change order.
ACCEPTED SCOPE

Smith Residence · Locked 🔒

Customer Accepted
Remove 2,850 SF existing grass
Install 4" recommended aggregate system
Install 3,135 SF turf including waste allowance
Install selected infill and perimeter edging
Final grooming, cleanup and walkthrough
PROJECT CHANGE DETECTED
+340 SF

Current field measurement is 3,190 SF, which is 11.9% larger than the accepted scope.

Additional Turf374 SF
Additional Base4.2 CY
Additional Labor7.8 hrs
Recommended Price Change+$2,860

Financials

Invoices, payments, change orders and real project profit in one place.
CONTRACT VALUE
$24,035
PAID
$12,017
50% deposit
OUTSTANDING
$12,018
PROJECTED MARGIN
40.0%

Profit Sensitivity

+1 JOB DAY
35.8%
margin
+10 LABOR HRS
38.1%
margin
+$1K MATERIALS
37.4%
margin
5% DISCOUNT
35.9%
margin

Documents

Everything the customer and crew need — without recreating information.

Customer Documents

Proposal Accepted
ContractSigned
Change Orders0
Invoices2
Warranty PackageReady at closeout

Project Documentation

Site Photos18
Installation Photos12
Technical Sheets4
Accepted Scope SnapshotLocked

More

Advanced project controls without cluttering the primary navigation.

Estimate Intelligence

AI Site Analysis
Installation Standard
Crew / Sub Optimizer
Equipment
Final Bid Audit

Project Controls

Scope Lock / Change Detector
Job Readiness
Closeout / Actual Profit
Estimate Version History
Installation Checklists
Task Timeline & Live Labor
Change Orders
V1 Beta Readiness
Project Audit Trail
Templates & Defaults

Estimate Version History

Experiment without fear. Every important change is recoverable.
V4 · Current
Value option created · 6:42 PM
V3
Base changed 4" → 3" · 6:38 PM
V2
Margin AI optimization applied · 6:34 PM
V1
Initial AI estimate generated · 6:31 PM

Build the perfect proposal

Internal estimate keeps every cost. Customer sees only what you choose.

RECOMMENDED
PREMIUM
$21,253
41.2% margin

Premium infill · recommended edging · full installation standard

VALUE
$18,950
35.6% margin

Approved value substitutions · simplified optional scope

Customer Pricing View

Total OnlyScope + TotalCategory TotalsFully ItemizedCustom

Visibility

Materials
Labor
Quantities
Unit Prices
Product Names
Grand Total
Customer Preview

Smith Residence

Premium Artificial Grass Installation

Complete site preparation, base construction, artificial grass installation, finishing and cleanup per accepted scope.

Schedule Job

AI checks people, crews, subs and equipment before confirming dates.

September 2026

DateJobCrewStatus
09/19Reynolds Residence · SO 1198Chris, Mike, JakeConfirmed
09/20OpenAvailable
09/21Smith ResidenceAI Suggested Crew BDraft

Scheduling Check

AI Recommendation: Schedule Smith Residence on 09/21 or replace Chris with Carlos.

Team & Crew Intelligence

Wages, loaded costs, skills and availability drive true labor costing.

EmployeeRoleWageLoaded CostSkillsStatus
ChrisLead Installer$31/hr$37/hrSeaming · Grading · PuttingAvailable
CarlosInstaller$25/hr$30/hrPet · SeamingAvailable
JakeLaborer$19/hr$23/hrDemo · BaseTraining

Projects

Lead → Bid → Won → Scheduled → Active → Completed → Closed

Next prototype pass

Pipeline, job readiness, locked scope, progress and closeout.

Products

Green Daddy preloaded + any supplier + custom items.

Universal Product Library

Supplier, product, unit, cost, sell price, dimensions, application, technical documents and future availability.

Job Readiness

Nothing starts until the critical pieces are ready.

Smith Residence

Signed ProposalReady
DepositReceived
TurfConfirmed
Base MaterialConfirmed
Accessories1 missing
CrewAssigned
EquipmentReady
JOB STATUS
NOT READY

OptiFill delivery confirmation is still missing. Everything else is cleared.

Daily Operations

One place for the owner, foreman and crew to know exactly what happens today.
CREW A · 7:30 AM

Reynolds Residence · SO 1198

Goal: Excavation + Base

Mike · Lead
Chris · Installer
Jake · Laborer
Sam · Laborer

Today’s Checklist

☑ Before-work photos
☑ Utilities / irrigation verified
☐ Excavation complete
☐ Base installed
☐ Base compacted
☐ End-of-day photos

Project Closeout

Finish the job, document it, invoice it, protect the warranty, learn from the result.

Completion Checklist

Final walkthrough photosComplete
Site cleanupComplete
Final invoicePending
Warranty packageReady
Actual job costsEntered
ACTUAL VS ESTIMATED
Estimated Margin41.2%
Actual Margin43.1%
Labor Savings+$420
Material Variance-$115

Communications

Send quotes, contracts, invoices and updates directly from the contractor’s connected email.
SEND QUOTE

Smith Residence

Proposal Ready
From
Garrett Reynolds <sales@contractor.com>
To
John Smith <john@example.com>
Subject
Your Artificial Grass Proposal – Smith Residence
✓ Proposal PDF✓ Online Approval Link✓ Warranty Summary
CUSTOMER EXPERIENCE

What happens after Send

1
Email sends from their company address
Customer sees the contractor’s normal business name and connected email.
2
Proposal opens in a branded customer view
The contractor controls whether pricing is total-only, scope + total, category totals, or fully itemized.
3
Customer approves or requests changes
Approval status is written back to the project automatically.
4
AI handles follow-up
If unopened or unsigned, the system can queue a follow-up email/text based on the contractor’s preferences.

Email Connection

Google / GmailConnected
Microsoft 365 / OutlookConnect
Custom Company EmailSMTP / provider

Communication Automation

Proposal sentEmail customer
Proposal viewed, not signedFollow up
Deposit receivedConfirmation
Schedule changedNotify customer
Final invoice dueReminder

Weather & Job Risk

Weather becomes operational intelligence — not just a forecast.
7-Day Job Forecast
SMITH RESIDENCE · FRANKLIN
84°
Partly cloudy · 20% rain
✦ AI Job Impact
Good installation conditions today. Heat expansion risk increases after 2 PM — stage final cuts accordingly.
Thu
88°
10% rain
Good
Fri
79°
70% rain
Risk
Sat
82°
35% rain
Watch
Sun
85°
10% rain
Good

Weather-Aware Scheduling

Friday · Johnson Backyard
Heavy excavation + base work
70% rain

Customer Weather Update

AI prepares the message; owner approves before it sends.

Field Tools

Fast on-site measurement, customer contact and documentation.
SITE MEASURE

Smith Residence

2,850 SF
Measured On Site
CUSTOMER CONTACT

John Smith

123 Franklin Road, Franklin, TN

On-Site Capture

Photos18 captured
MeasurementsConfirmed
UtilitiesVerify
Gate Width38"
DrainageReview
Voice Notes2 saved

Installation Checklists

Project-specific quality control built from the selected installation system.
RESIDENTIAL LANDSCAPE

Smith Residence · Day 1

5 of 9 complete
Before-work photos
Utilities / irrigation identified
Excavation depth verified
Subgrade inspected
Drainage documented
Base depth before compactionRequired
Compaction completePending
Final grade / slopePending
End-of-day photosPending

Project Audit Trail

Every important financial, scope, schedule and field change is recorded.
Base depth changed 4" → 3"
Garrett · Today 2:21 PM · Estimate V3
AI Margin Optimization applied
Garrett · Today 2:18 PM · 34.7% → 40.2%
Customer approved proposal
John Smith · Today 1:54 PM · Scope locked
Site photos uploaded
Chris · Today 12:42 PM · 18 photos

Templates & Company Defaults

Make every estimate faster without forcing every contractor to work the same way.

Estimate Templates

Standard ResidentialDefault
Premium Pet SystemSaved
Putting GreenSaved
Playground + PadSaved

Company Defaults

Target Margin40%
Proposal ViewTotal Only
Residential Base4"
Default Waste10%
Deposit50%

Customer Quote Preview

See exactly what your customer will see before you send anything.
Customer View
GD GREEN DADDY
Premium Artificial Grass Solutions
PROPOSAL #1048
August 19, 2026
Valid for 30 days
PREPARED FOR
John Smith
123 Franklin Road
Franklin, TN
PROJECT
Smith Residence
Residential Artificial Grass Installation
Approx. 2,850 SF

Recommended Installation

Premium Residential Turf System

Complete site preparation and artificial grass installation using the selected premium turf system, recommended base construction, perimeter restraint, infill, finishing and final site cleanup.

Scope of Work

Site preparation & excavationIncluded
Aggregate base installation & compactionIncluded
Premium artificial grass installationIncluded
Premium infill & final groomingIncluded
Perimeter finishing & cleanupIncluded

Project Investment

Premium Installation
Complete project total
$21,253.00

Payment Schedule

50% Deposit$10,626.50
Final Payment at Completion$10,626.50

Warranty & Terms

Installation workmanship and applicable manufacturer warranty information will be provided with the completed project. Final installation is subject to the accepted scope, site conditions, approved change orders and company terms.

Ready to move forward?
Approve this proposal electronically to begin scheduling your project.
PREVIEW CONTROLS

What the customer sees

Product Name
Scope of Work
Material Pricing
Labor Pricing
Quantities
Payment Schedule
Warranty / Terms
MOBILE CUSTOMER VIEW
PROPOSAL #1048

Smith Residence

Premium Turf Installation
PROJECT TOTAL
$21,253

Complete site preparation, base, turf installation, infill and cleanup.

Task Timeline & Live Labor

Plan the day by employee and task, then compare actual pace to budget in real time.
LIVE
REYNOLDS RESIDENCE · SO 1198

Crew A · Today

Job Pace
Ahead 42 min
8:00–11:00 AM
Jake · Excavation
Planned 3.0 hrs · Actual 2.6 hrs
Complete ✓
Jake · LaborerSam · Laborer
11:00 AM–2:00 PM
Jake · Base Prep
Planned 3.0 hrs · In progress 1.2 hrs
In Progress
8:00 AM–12:00 PM
Chris · Grade / Compaction Oversight
Planned 4.0 hrs · Actual 3.8 hrs
Complete ✓
Chris · LeadCarlos · Installer
12:30–3:30 PM
Chris + Carlos · Turf Layout / Seam Prep
Planned 3.0 hrs · Not started
Upcoming
DAY PLAN

Employee Task Schedule

Employee8–1111–22–5
JakeExcavation ✓Base PrepCleanup
SamExcavation ✓Material HandlingInfill Prep
ChrisGrade / Compaction ✓Turf LayoutSeams
CarlosBase Support ✓Turf LayoutSeams
LIVE LABOR INTELLIGENCE

Profit Impact

Planned Labor
$3,840
Current Forecast
$3,654
Labor Variance
+$186
Projected Margin
41.0%
✦ AI NEXT MOVE

Use the time advantage.

Move Jake to material staging immediately after base prep. Keep Chris + Carlos together for turf layout. This preserves the current lead and could recover another 20–30 minutes.

Potential additional savings+$74

Owner Notifications

Smart Alerts
Task >30 min early
Task >45 min late
Job moves behind schedule
Labor budget projected over
Daily completion summary
ACTIVITY FEED
Excavation completed
Jake · 10:35 AM · 25 min early
Labor forecast updated
Projected savings +$186
Base Prep started
Jake · 10:42 AM
Owner notified
Job status changed to Ahead

Notifications

Only the alerts that need attention — not noise.

Needs Attention

Johnson Backyard
Friday forecast now shows 70% rain.
Weather
Smith Residence
OptiFill delivery confirmation still missing.
Materials
Reynolds Residence
Crew is 42 minutes ahead; projected labor savings +$186.
Ahead
Proposal Viewed
Anderson Residence viewed proposal 3 times.
Sales

Alert Preferences

Job behind schedule
Labor projected over budget
Material not ready
Weather threatens job
Proposal viewed / not signed
Payment received

Change Orders

Protect the accepted scope and price every change before work continues.
CO #002 · SMITH RESIDENCE

Additional 340 SF

Awaiting Approval

Field measurement increased from 2,850 SF to 3,190 SF after customer expanded the requested area.

Additional Turf374 SF
Additional Base4.2 CY
Additional Labor7.8 hrs
Change Order Total$2,860

Change Order Rules

Accepted scope lockedOn
Require customer approvalOn
Apply company margin target40%
Sync approved amount to invoiceOn

V1 Beta Readiness

Master launch checklist for the contractor operating system.
Pre-Launch Beta

1. Estimate & Sales

Core Ready
Quick AI Estimate + Full Estimate
Fast on-site entry plus full advanced builder.
V1
AI Site Review / Photo Risk
Access, excavation, drainage, irrigation and labor exposure.
V1
Installation Standard + Overrides
Recommended baseline with contractor control.
V1
Premium / Value / Custom Scenarios
V1
Margin AI + Bid Audit + Confidence Score
V1
Proposal Visibility Controls + Customer Preview
V1

2. Customer & Documents

Core Ready
Connected Email / Send Quote
V1
PDF / Print / Mobile Quote Preview
V1
Proposal Approval + Scope Lock
V1
Change Orders
V1
Invoices / Payment Schedule / Warranty / Closeout
V1

3. Labor & Operations

Core Ready
Employees, wages, loaded cost, roles & skills
V1
Internal Crew / Sub / Hybrid
V1
Crew Optimizer + Equipment
V1
Smart Calendar + Conflict Prevention
V1
Daily Ops + Task Timeline + Live Labor
V1
Installation Checklists + Field Tools
V1

4. Readiness, Intelligence & Controls

Core Ready
Job Readiness / Material Readiness
V1
Weather & Job Risk
V1
Actual vs Estimated Profit
V1
Audit Trail + Version History + Autosave
V1
Notifications / Smart Alerts
V1
Templates & Company Defaults
V1

5. Final Beta Gates

Validate
!
Real estimate math validation
Run completed contractor jobs through material, labor, margin and quantity formulas.
Test
!
Role/permission validation
Owner, estimator, foreman and field employee visibility/edit rights.
Test
!
Mobile field usability
One-handed use, no horizontal drift, fast task completion, photo capture.
Test
!
Document output validation
PDF proposal, invoice, contract, change order and warranty layout.
Test
!
Data recovery / backup / error handling
Autosave, failed upload/send, interrupted connection and restore behavior.
Test
BETA READINESS SCORE
86%
Feature Scope Ready

Feature design is strong. Remaining work is primarily implementation validation, real-job math testing, permissions, document generation, mobile QA, and failure/recovery testing.

Do Not Add Before Beta

Keep these preserved for V2 unless they fix a critical beta issue.

Supplier marketplace / live multi-distributor inventory
Advanced accounting & payroll integrations
Financing marketplace
Deep LMS / certification academy
Industry benchmarking network
Advanced logistics / freight optimization
Supplier advertising / sponsored products

Company Settings

White-label identity, margins, proposal defaults, wages, installation defaults and permissions.

START AN ESTIMATE

How do you want to build it?

✦ Quick AI Estimate
Photos + measurements + voice. AI builds the first draft using your company defaults.
FASTEST
▤ Full Estimate
Complete guided builder with full control over installation, materials, crew, subs, equipment and margin.
CONTINUE A DRAFT
Smith Residence
2,850 SF · saved 4 min ago
Johnson Backyard
Pet Turf · yesterday